Rehabilitation of Gas Transmission Pipelines up to 30 bar Operating Pressure

 

With the starline®HPL-G CIP (Cured-In-Place) technology, gas transmission pipelines with an operating pressure up to 30 bar can be relined in individual lengths up to 600 m in order to restore the required safety standard fast and permanently. To fulfill the resulting requirements, as materials a seamlessly woven PLASTIC coated liner made of high-strength yarns in connection with a special cold-curing epoxy resin into application…. Prior to lining the pipe, it is shut down and thoroughly cleaned by ultra-high water-jet system depending on the degree of contamination and roughened up by sand-blasting.
Since the liner's diameter is designed to match the internal diameter of the pipeline to be rehabilitated, in spite of the high-strength material a fold-free lining is achieved…. The cold-curing resin system with a very long pot time excludes the tensions thermally-induced by warm-curing War in the host pipeline, which especially cause welding-seam fractures in bitumen-coated transmission pipelines. Once the resin has cured, the liner is completely and permanently bonded to the host pipe preventing gas migration and stopping internal corrosion.
The starline®HPL-G technology has been certified by DVGW VP 404 for a maximum operating pressure of 30 bar. The service life, verified by 10000-hour time-to-rupture tests is at least 50 years with a more than twice safety factor to bridge corrosion defects with a diameter up to 50 mm. Existing and future corrosion fractures, which pose a special risk for high-pressure gas pipeline are therefore efficiently, fast and permanently removed using the starline®HPL-G technology. Thus, the required safety standard is permanently restored and additionally a minimizing the risk of welding seam fractures.
An economic technology performance is enabled by inspection and rehabilitation of long pipelien sections for which a completely new and to the specific requirements designed world-wide unique technology equipment is available.
 
The entire rehabilitation operation of gas and drinking water transmission pipelines is based on the basic principle of the proven starline®1000/2000 technologies whereby the following principal changes are:

  • TV inspection with 12-point caliper measurement for documented condition detection and determine internal diameter or deformations with self-propelled robot up to 1000 m length. Inadmissible internal diameter deviations are automatically detected and localized.
  • Saturate liner with the resin via automatic high-power resin mixing and measuring system with a delivery rate up to 2 to/h and completely new liner application unit.
  • Invert resin-filled liner into pipeline via special pressure drum for inversion pressure up to 4. bar with air.
Areas of application:
Medium: Natural gas and drinking water
Dimension: ND 200 - ND 600 (1200)
Length: individual section up to 600 m
Host pipe: welded steel pipe
For applications, such as:
  • actual or potential corrosion fractures,
  • preventive protection against internal corrosion,
  • sealing of culverts, railroad underpasses and nature reserves, and
  • preventive sealing of fracture-prone welding seams
the starline®HPL-G technology restores operational safety. After rehabilitation, the pipeline can be pressurized with the original operating pressure. Pipes with rust penetrations of 50 mm diameter remain safe to operate.
Therefore, a relined pipeline is the same as a new pipe and in contrast to repair methods such as cement mortar lining fully active (after rehabilitation with the starline®HPL-G fabric-hose relining system valuable, amortizable performance).
Compared to open-trench construction, excavation works are reduced by more than 95 %, because contingent on the diameter a construction pit is required only every 450 to 600 meters.

 

 